Drains Laid


Well went on my usual Saturday drive and found the pipes had been laid and the ground was prepped ready for the next stage for the slab to be poured.





Front view of the lot with the house shaped out and pips laid out. The master ensuite to the right centre, and kitchen and bathroom to the rear.



View looking back towards the street.



Power mains box waiting for a brick wall to rest up against.
Posted by Picasa

Thursday, July 2, 2009

Night Vision Pipe Works

A quick drive to the lot after work last night showed a pile of pipes and a pile of red aggregate. So the draining laying is commencing.



Further down the back a deep hole had been dug where the easement is, to connect what I assume to be the sewerage downpipe. Lucky I didnt fall in the hole in all my nice work clothes!




So hope to see a lot of progress since this last visit when I go this weekend and better quality pictures with daylight! Heres to no more rain in Melbourne as Im sure the rain today wouldnt have helped the construction cause.